Latest Blogs

Scott Schedule Template: Legal Proceedings Guide

By Glen Sim

A Scott Schedule template provides a structure for recording disputed building items and the parties’ responses. Start with the official form for the court or Tribunal hearing the matter, together with its directions. A generic example may help explain the process, but should not be assumed to be the required filing document.

Official Scott Schedule forms

NCAT publishes Word and PDF versions through its Consumer and Commercial Division forms page. Choose the form relevant to defective workmanship or extras claimed. For NSW court proceedings, check the NSW Online Registry’s Scott Schedule form information.

Complete the columns required for your matter

Read the instructions on the form and retain its headings. A useful entry lets the reader identify the item, the allegation, the response and the evidence supporting each position.

In the NCAT defective workmanship form, the respondent provides a loss assessment even if liability is denied. It is not simply a settlement-offer column. Leave the Tribunal Member’s comments column for the Member. Our NCAT format guide explains these distinctions.

Prepare the information before filling the template

  • Assign a stable item number and a precise location to each issue.
  • Identify the alleged defect or incomplete work and the relevant contractual requirement.
  • Separate the defect finding from the proposed rectification scope and its cost.
  • Reference report paragraphs, photographs, drawings and quotations consistently.
  • Explain the basis of quantities, rates and totals, including assumptions.
  • Identify information that is missing or requires further inspection or testing.

Illustrative drafting prompt

For a window water-entry item, record the observed location and symptoms, the evidence relied on, the proposed repair and cost basis, and the respondent’s reasons for agreement or disagreement. Avoid stating an untested cause as a proven fact.

This is a drafting prompt, not a real claim, a priced repair recommendation or a court finding. Complete the official form using the evidence specific to your matter.

Download, check and exchange the correct version

Open the NCAT defective workmanship Scott Schedule PDF, or select the editable Word version from the official forms page.

Check the orders for deadlines and the required sequence of exchange, filing and service. Keep a dated working copy and preserve the other party’s entries when adding a response. A completed template does not replace the supporting evidence or guarantee a result.

Request assistance from Awesim

Send the orders, existing reports, current schedule and deadline for a proposal covering the work needed. State whether you need an initial schedule, a response, an inspection or rectification costing.

Read about Awesim’s Scott Schedule services or request a consultation.

author avatar
Glen Sim Managing Director
Glen Sim is the Founder and Director of Awesim Building Consultants. He is a qualified carpenter, licensed builder and building expert witness with more than 35 years of construction experience. Based in New South Wales, he provides building consultancy, expert witness reports, Scott Schedules and building defect inspections across Australia, including support for NCAT building disputes in NSW.

Share the Post:

Scroll to Top