NCAT Scott Schedule Explained: A Complete Guide

Scott Schedule service: Awesim provides Scott Schedule preparation and responses for building disputes. Read about Glen Sim, Managing Director.
An NCAT Scott Schedule organises alleged defective or incomplete work into numbered items. It helps the applicant, respondent and Tribunal compare the issues and the amounts in dispute alongside the supporting evidence.
The schedule is a summary of positions. It does not establish that an allegation is proved, replace an expert report, or guarantee a settlement or hearing result.
Start with the directions for your matter
NCAT may give directions about expert reports, a Scott Schedule, document exchange and an expert meeting. Check the orders for the required format, sequence and dates. The home building applications guideline explains these procedural steps.
NCAT publishes separate schedules for defective workmanship or materials and for extras claimed. Use the official forms page for PDF and Word versions. Our NCAT Scott Schedule format guide explains the defective-work form’s fields.
Separate the issue, proposed work and amount
For each disputed item, identify the location and allegation clearly. Keep the question of whether there is a defect separate from the appropriate rectification and its cost. Agreement that work is defective does not necessarily mean agreement on either scope or price.
The respondent’s estimate of loss is not merely an offer to settle. NCAT’s defective-work schedule asks for that estimate even where liability is denied. The space for the Tribunal Member’s comments is reserved for the Member.
Connect every item to the supporting evidence
- Use the same item numbers in the schedule, report and photographs.
- Identify the relevant contract requirement, drawing or specification where available.
- Explain which observations or documents support the technical opinion.
- Show the basis of proposed rectification quantities, rates and totals.
- Identify matters that remain uncertain or need further access, testing or specialist input.
A concise row should point the reader to the detailed evidence without concealing assumptions or limitations. Avoid presenting a disputed cause as an agreed fact.
Expert discussions and joint schedules
In suitable home building matters, NCAT may arrange an expert conclave. Its conclave guide describes how experts identify agreement and remaining differences and may prepare a joint Scott Schedule. Follow the specific directions and distinguish that joint process from each party’s initial schedule.
Prepare for an Awesim fee proposal
Provide the orders, existing reports, disputed item list, photographs and deadline. Confirm whether the work includes an inspection, a new expert report, rectification costing, responses to another expert, or attendance at a conclave or hearing.
Contact Awesim to discuss the investigation and reporting scope required for your matter.