Scott Schedule in Sydney
Awesim Building Consultants prepares Scott Schedules for building disputes in Sydney. A schedule sets out the disputed items and the parties’ positions in a format that can be compared alongside the supporting evidence.
Choose expertise that matches the disputed issues
The required expertise depends on the questions to be answered. Building defects, structural design and rectification costing may call for different disciplines. A professional title alone does not establish that someone has the relevant expertise for every issue.
Awesim’s scope can include inspection, defect itemisation, rectification scope and cost assessment where agreed and within the consultant’s expertise. Confirm whether an existing expert report can be used or whether further investigation is needed.
Read about Glen Sim’s building and construction experience and our expert witness reporting services. The proposed work should follow the orders and timetable for your particular proceeding.
Steps to Obtain a Scott Schedule Report
- Identify the Need:
- Check the court or tribunal’s orders and identify the disputed items. A Scott Schedule may be directed for a building dispute; do not assume that every matter requires the same documents or format.
- Select a Qualified Professional:
- Choose a building consultant, legal firm, expert witness, or quantity surveyor with experience in preparing Scott Schedule reports. Ensure they have relevant expertise and a good track record.
- Initial Consultation:
- Arrange an initial consultation to discuss your case, provide relevant documentation, and outline the scope of work. This step is crucial to ensure the professional understands the specifics of your dispute.
- Site Inspection and Documentation:
- The consultant will likely conduct a site inspection to document the issues, gather evidence, and take necessary measurements and photographs.
- Preparation of the Scott Schedule:
- The professional will prepare the Scott Schedule, detailing each issue, the claimant’s position, the respondent’s position, and the supporting evidence.
- Review and Submission:
- Check factual details and document references, while leaving the expert responsible for their independent opinions. Follow the orders about service and filing, and confirm who will carry out those steps.
Discuss your Sydney building dispute
Provide the orders, existing expert reports, photographs and disputed item list when requesting a proposal. This helps define the inspection, reporting and costing work required, together with the deadline. For the process used in suitable home building matters, see NCAT’s guide to expert conclaves.
Contact Awesim to discuss the scope and availability. An independent schedule helps explain the technical issues; it does not guarantee a particular outcome.


