Scott Schedule Cost: What You’re Paying For Preparation

Scott Schedule service: For professional preparation, defect itemisation and NSW dispute support, see Awesim’s Scott Schedule NSW service. Read about Glen Sim, Managing Director.
The fee for Scott Schedule preparation depends on the work included in the proposal. Ask for a written scope before budgeting: document review, an inspection, an expert report, repair costing and hearing attendance are different services and should be identified clearly.
Awesim’s published fee guide lists Scott Schedule reporting at $550 per issue including GST, as an indicative rate. Document and report review and travel may also apply. The written fee proposal should confirm the work included and the total for your matter.
This guide explains how to compare a quotation and avoid gaps in the brief. Request a proposal with the existing documents and deadline.
What is being prepared?
A Scott Schedule organises disputed items and the parties’ positions. Preparing a new schedule, responding to an existing one, and updating it after expert discussions may involve different amounts of work. Tell the consultant which stage your matter has reached.
Check what the quoted fee includes
Ask the proposal to identify the deliverables, assumptions and any exclusions. Relevant components may include:
- Document review: the orders, contract, drawings, existing reports and current schedule.
- Site investigation: inspection, measurements, photographs and any agreed testing.
- Technical assessment: defect findings, repair options and reasons for the opinion.
- Rectification costing: quantities, rates, quotations and pricing assumptions.
- Schedule preparation: itemisation, evidence references and responses.
- Later involvement: amendments, expert conferencing, joint reports or hearing attendance.
Do not assume that all of these services are included in a single preparation fee. Confirm GST, travel and any third-party specialist charges in the written proposal.

Why two schedules may involve different fees
Number and complexity of items
The item count helps describe the scope, but it does not establish a universal per-item price. A small number of difficult issues can require more investigation than a longer list of straightforward observations.
Quality of the existing information
Well-indexed reports, labelled photographs and clear orders make the brief easier to assess. Missing documents, inconsistent item numbers or an unclear repair scope may require additional review.
Access, testing and specialist input
Identify inaccessible areas, completed repairs and any testing already undertaken. Some technical questions may require a specialist whose work needs to be separately scoped.
Compare equivalent scopes
When reviewing proposals, compare the actual deliverables and exclusions. A price for transcribing an existing report into a schedule is not directly comparable with a price that includes investigation, a new expert report and costing.
Use NCAT’s official forms page to obtain the relevant template. Professional preparation fees concern the agreed work in your matter, rather than simply obtaining a blank form.


Questions to ask before accepting a proposal
- Is a new expert report required, or will existing evidence be used?
- Does the scope cover an applicant’s schedule, a respondent’s reply or a joint document?
- Are inspection, testing and repair costing included?
- What amendments are included, and how will additional work be authorised?
- Are expert conferences and hearing attendance separately quoted?
- Can the work be completed within the directions timetable?
Request an Awesim fee proposal
Send the orders, existing Scott Schedule, expert reports, relevant contract documents and photographs. State the property location, the next deadline and the assistance you need.
Awesim will need to assess the requested work before providing a fee proposal. Read more about Scott Schedule preparation and responses, or contact Awesim to discuss your matter.